Planning Application
In June 2024, RES submitted a planning application for the 150MW Fairgreen Battery Energy Storage System on a parcel of land at the centre of the Fairglen Interchange, between South Benfleet and Rayleigh, Essex.
Electronic copies of the planning application and accompanying documents can be viewed or downloaded by clicking on the links below.
Statement of Community Involvement (SCI)
Figures
- Auxiliary Transformer
- Battery Storage Enclosure
- BESS Substation Building
- Capacitor Bank Drawing
- DNO Substation Building
- Harmonic Filter Drawing
- Infrastructure Layout
- Infrastructure Layout Elevation Views
- Location Plan Drawing
- LV Feeder Pillar and Aggregation Panel Details
- Power Conversation System and Transformer Twin Skid
- Pre-Insertion Resistor
- Spares Storage Container
- Substation Compound
- Substation Layout
- Temporary Construction Compound Layout
- Typical Access Track Detail
- Typical Acoustic Fence Detail
- Typical Lighting and CCTV Column Drawing
- Typical Security Fence Detail
- Typical Stock Proof Fence
- Typical Water Channel Crossing Culvert
Agricultural Land Classification Report
Biodiversity Net Gain Calculations
Construction Environment Management Plan
Construction Traffic Management Plan
Outline Fire Risk Management Plan
Flood Risk Assessment and Surface Water Drainage Strategy
- Appendices
Landscape and Visual Appraisal (LVA)
Application details
The planning application may also be viewed on Basildon Council's website at https://www.basildon.gov.uk/eplanning The planning reference number 25/00898/FULL.
If you would like to support the project, or submit any kind of representation, you can do so by submitting a comment on the website above.
Site Location Map
Click to enlarge
Infrastructure Layout
Click to enlarge